BLSK Energy

Market Overview

Market dynamics, technology positioning, and commercial pathway.

Company Position

BLSK Energy is commercializing pyroprocessing — a proven electrochemical technology for converting used nuclear fuel into metal fuel for next-generation reactors. Through a unique CRADA with Argonne National Laboratory, BLSK is advancing a technical and institutional position built around Argonne's demonstrated program and the current regulatory pathway.

BLSK Energy's market position is characterized by:

Technology Maturity

The technology has been demonstrated at engineering scale for 30 years. The remaining work is commercialization, not scientific proof of concept.

Potential Applications

Waste management, fuel production, and technology licensing are potential applications for the platform.

Policy and Market Context

Policy changes, AI-driven energy demand, and advanced reactor fuel constraints shape the current market context.

The Global Feedstock

Worldwide Used Fuel Inventory

tonnes Heavy Metal (tHM)
296,000
Countries
17
Energy Remaining
95%

Inventory data as of 2020. U.S. inventory now exceeds 95,000 tHM (~2,000 tHM/yr growth).

Source: Stimson Center (2020); IAEA/WNA annual discharge rates; BLSK deck (2026)

Used nuclear fuel inventories are growing worldwide. The U.S. alone holds more than 95,000 tonnes — and adds ~2,000 tonnes per year. Globally, inventories are growing at ~7,850 tHM/year, with a 17% increase over the past five years.

153,463

North America (tHM)

51.8% of global inventory

+43,175

5-Year Growth (tHM)

17% increase globally (2020–2026)

Market Scale

Global inventory: $148B — global SNF inventory at $500/kg

Potential served market: $1.2B by 2035 → $12B+ by 2050

HALEU market: $2.2B (2030) → $6.2B (2035)

BLSK Assets and Workstreams

01

Unique CRADA with Argonne National Laboratory, where pyroprocessing was demonstrated at engineering scale

02

Principal Investigator relationship with Dr. Yoon Il Chang — the inventor of the technology

03

Completed conceptual design for 100 T/yr and 400 T/yr facilities (Landmark Foundation CRADA, 2013–2018)

04

Active 60-month program for detailed engineering and NRC licensing preparation

05

Architect-engineer (Merrick & Company) under MOU

06

Teaming agreement with EnergySolutions for site-related and waste-management services

07

Institutional knowledge from Argonne's decades of fuel-cycle work

08

Current work program designed to advance from national-lab demonstration to deployable infrastructure

09

Advisory board of recognized leaders in commercial nuclear power, nuclear engineering, and finance

Together, these assets define BLSK's current commercialization work program.

Contact

For company inquiries, contact contact@blskenergy.com

Information on this website is provided for general informational purposes only. It is not an offer to sell or a solicitation of an offer to buy securities, and it should not be used as the basis for any investment decision. Statements about future plans, markets, costs, facilities, approvals, partnerships, financing, or commercial outcomes are forward-looking and subject to risks and uncertainties; actual results may differ materially.